msproject.su - dns.ninja

msproject.su

DNSSEC⚠️ Not signed
A81.176.226.136🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
PTRbogdanov-associates.ru
NSns1.1gb.ru
A81.176.228.20🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
NSns2.1gb.ru
A81.177.32.105🇷🇺 RTCOMM-AS81.177.32.0/20 RTCOMM-RU
NSns3.1gb-ru.com
A94.249.192.249🇩🇪 ASGHOSTNET94.249.128.0/17 GHOSTnet GmbH IP Space
MXmail-s27.1gb.ru
A81.176.226.24🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
PTRs27.in-solve.ru
A81.176.226.25🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
PTRs27.in-solve.ru
A81.176.226.26🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
PTRs27.in-solve.ru
A81.176.226.28🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
PTRs27.in-solve.ru
A81.176.226.29🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
PTRs27.in-solve.ru
A81.176.226.30🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
PTRs27.in-solve.ru
A81.176.226.31🇷🇺 RTCOMM-AS81.176.0.0/16 RTCOMM-RU
PTRs27.in-solve.ru
TXTv=spf1 ip4:81.176.69.0/24 ip4:81.176.224.0/21 ip4:81.177.0.0/19 ip4:81.177.12...
SOAns1.1gb.runoc@1gb.ru serial=31

su

DNSSEC🔒 Signed (DS record present)
NSa.dns.ripn.net
NSb.dns.ripn.net
NSc.tld-servers.ru
NSd.dns.ripn.net
NSe.dns.ripn.net
NSf.dns.ripn.net
SOAa.dns.ripn.nethostmaster@ripn.net serial=650210105
⚠️ On DNS blocklist: spam-tlds

Subdomains

Same first word

Similar names

DNS History

7 records (5 active, 2 former)

20162017201820192020202120222023202420252026NSns1.1gb.runs2.1gb.runs3.1gb-ru.comMXmail-s27.1gb.ruA81.176.226.13681.176.226.5381.177.160.43
NSns1.1gb.ru2015-08-10 → 2026-08-06 · 2 obs
● 2015-08-10 19:49:16
● 2026-08-06 04:00:28
NSns2.1gb.ru2015-08-10 → 2026-08-06 · 2 obs
● 2015-08-10 19:49:16
● 2026-08-06 04:00:28
NSns3.1gb-ru.com2016-09-10 → 2026-08-06 · 3 obs
○ 2015-08-10 19:49:16
● 2016-09-10 00:37:22
● 2026-08-06 04:00:28
MXmail-s27.1gb.ru2015-08-10 → 2026-08-06 · 2 obs
● 2015-08-10 19:49:16
● 2026-08-06 04:00:28
A81.176.226.1362026-03-04 → 2026-08-06 · 3 obs
○ 2017-04-19 11:04:38
● 2026-03-04 09:10:02
● 2026-08-06 04:00:28
A81.176.226.532015-08-10 → 2015-11-26 · 4 obs
● 2015-08-10 19:49:16
● 2015-11-26 05:31:14
○ 2016-03-27 04:39:24
○ 2026-08-06 04:00:28
A81.177.160.432016-03-27 → 2017-04-19 · 5 obs
○ 2015-11-26 05:31:14
● 2016-03-27 04:39:24
● 2017-04-19 11:04:38
○ 2026-03-04 09:10:02
○ 2026-08-06 04:00:28

🔍 DNS Trace

📋 Delegation Chain

ZoneNameserversGlue
suf.dns.ripn.net, a.dns.ripn.net, d.dns.ripn.net, b.dns.ripn.net...12 records
msproject.suns3.1gb-ru.com, ns1.1gb.ru, ns2.1gb.ru-

✅ Authoritative Response

Server:81.177.32.105

NS records: ns3.1gb-ru.com, ns1.1gb.ru, ns2.1gb.ru

🔒 DNSSEC Status

⚠️ Insecure (no DNSSEC)

No DS record for msproject.su (unsigned zone)

⏱️ Timing

Total: 3305ms | Queries: -

📄 Records

TypeCountSample Data
A181.176.226.136
NS3ns2.1gb.ru, ns1.1gb.ru...
MX2mail-s27.1gb.ru (pri: 10), mail-s27.1gb.ru (pri: 8)
TXT1v=spf1 ip4:81.176.69.0/24 ip4:81.176.224
SOA1ns1.1gb.ru noc.1gb.ru

📌 Glue Records Collected

Total: 12

Out-of-bailiwick: 12 (f.dns.ripn.net, e.dns.ripn.net, d.dns.ripn.net...)

Analysis

Hierarchy

www.msproject.su is delegated beneath msproject.su.

IP Addresses

msproject.su has exactly one IP address — 81.176.226.136.

microsoft-project.su, pmprofy.ru, msprojectdownload.ru plus two other host names have IP numbers in common with msproject.su.

Name Servers

msproject.su carries NS records delegating to ns3.1gb-ru.com, ns1.1gb.ru and ns2.1gb.ru.

There is at least partial name server overlap between msproject.su and other domains — admamr.ru, svetlogorsk-edu.ru, galleries.ru and two more among them.

These name servers frequently co-occur with the name servers ns3.1gb-panel.com and ns3.1gb.ru.

ns3.1gb-ru.com points to 94.249.192.249; ns1.1gb.ru points to 81.176.228.20; ns2.1gb.ru points to 81.177.32.105 — each hostname maps to exactly one IP address.

Mail Servers

msproject.su uses one mail server — mail-s27.1gb.ru.

The mail server setup of msproject.su matches that of other domains such as scandicraft.ru, lexrus.ru, ledsystems.ru and two others.

At least some of the mail servers used by msproject.su are shared with other domains: mikei.ru, garus.pro, kitty.perfect-gold.ru and two others among them.

These mail servers often appear in conjunction with the mail servers mail.1gb.ru, mail-s30.1gb.ru, mail-s22.1gb.ru and mx.yandex.net.

mail-s27.1gb.ru has 7 IP addresses: 81.176.226.24, 81.176.226.25, 81.176.226.26 plus 4 more.