msproject.com.br - dns.ninja

msproject.com.br

DNSSEC⚠️ Not signed
A162.210.102.41πŸ‡ΊπŸ‡Έ AS14555162.210.96.0/21 LiquidNet US LLC
NSns1.exclusivehosting.net ⭐
A162.210.102.140πŸ‡ΊπŸ‡Έ AS14555162.210.96.0/21 LiquidNet US LLC
PTRdns1.supremedns.com
NSns2.exclusivehosting.net
A198.23.56.254πŸ‡ΊπŸ‡Έ AS14555198.23.48.0/20 LiquidNet US LLC
PTRhosted.by.liquidnetlimited.com
MXmx1.exclusivehosting.net ⭐
A198.23.53.39πŸ‡ΊπŸ‡Έ AS14555198.23.48.0/20 LiquidNet US LLC
PTRmx1.supremebox.com
MXmx2.exclusivehosting.net ⭐
A198.23.53.42πŸ‡ΊπŸ‡Έ AS14555198.23.48.0/20 LiquidNet US LLC
PTRmx2.supremebox.com
SOAns1.exclusivehosting.netroot@exclusivehosting.net serial=1460715868

com.br

DNSSEC⚠️ Not signed
NSa.dns.br ⭐ ⚠️ Not in parent delegation
NSb.dns.br ⚠️ Not in parent delegation
NSc.dns.br ⚠️ Not in parent delegation
NSd.dns.br ⚠️ Not in parent delegation
NSe.dns.br ⚠️ Not in parent delegation
NSf.dns.br ⚠️ Not in parent delegation
SOAa.dns.brhostmaster@registro.br serial=2026218420
rank #510679 globally
rank #3629 in the tld
WOT: SAFE (69/100)

Same first word

Similar names

DNS History

5 records (5 active, 0 former)

20162017201820192020202120222023202420252026NSns1.exclusivehosting.netns2.exclusivehosting.netMXmx1.exclusivehosting.netmx2.exclusivehosting.netA162.210.102.41
●NSns1.exclusivehosting.net2015-07-02 β†’ 2026-08-06 Β· 2 obs
● 2015-07-02 01:58:04
● 2026-08-06 17:53:44
●NSns2.exclusivehosting.net2015-07-02 β†’ 2026-08-06 Β· 2 obs
● 2015-07-02 01:58:04
● 2026-08-06 17:53:44
●MXmx1.exclusivehosting.net2015-07-02 β†’ 2026-08-06 Β· 2 obs
● 2015-07-02 01:58:04
● 2026-08-06 17:53:44
●MXmx2.exclusivehosting.net2015-07-02 β†’ 2026-08-06 Β· 2 obs
● 2015-07-02 01:58:04
● 2026-08-06 17:53:44
●A162.210.102.412015-07-02 β†’ 2026-08-06 Β· 2 obs
● 2015-07-02 01:58:04
● 2026-08-06 17:53:44

πŸ” DNS Trace

πŸ“‹ Delegation Chain

ZoneNameserversGlue
brf.dns.br, d.dns.br, b.dns.br, e.dns.br...-
msproject.com.brns2.exclusivehosting.net, ns1.exclusivehosting.net-

βœ… Authoritative Response

Server:162.210.102.140

NS records: ns2.exclusivehosting.net, ns1.exclusivehosting.net

πŸ”’ DNSSEC Status

⚠️ Insecure (no DNSSEC)

No DS record for msproject.com.br (unsigned zone)

⏱️ Timing

Total: 538ms | Queries: -

πŸ“„ Records

TypeCountSample Data
A1162.210.102.41
NS2ns1.exclusivehosting.net, ns2.exclusivehosting.net
MX2mx1.exclusivehosting.net (pri: 10), mx2.exclusivehosting.net (pri: 10)
SOA1ns1.exclusivehosting.net root.exclusiveh

Analysis

IP Addresses

msproject.com.br resolves to just one IP address, 162.210.102.41.

Two other host names, along with savina.com, jlink.co.uk and virtualnapavalley.com, also share IP numbers with msproject.com.br.

Name Servers

msproject.com.br uses two name servers for its delegation: ns1.exclusivehosting.net and ns2.exclusivehosting.net.

msproject.com.br shares its NS records with other domains, for example zimmermann-elektronik.eu, g2a.pl, dentallife.pt and two others.

msproject.com.br partially shares its NS delegation with several other domains, including kingstontrading.biz, nikolay-levashov.ru, ranjodhfurniture.com and two others.

These name servers regularly co-occur with the name servers ns3.exclusivehosting.net, ns4.exclusivehosting.net and dns1.supremedns.com.

ns1.exclusivehosting.net resolves to 162.210.102.140. ns2.exclusivehosting.net resolves to 198.23.56.254. Both host names point to a single IP number.

Mail Servers

msproject.com.br is served by two mail servers, mx1.exclusivehosting.net and mx2.exclusivehosting.net.

Among the domains sharing a mail server setup with msproject.com.br are rm.gr, www.supremecenter110.com, www.ttaxitravel.com and two others.

There is at least a partial MX overlap between msproject.com.br and other domains, including ngischools.com, libroesoterico.com, inheltek.net and two others.

mx1.exclusivehosting.net resolves to 198.23.53.39. mx2.exclusivehosting.net resolves to 198.23.53.42. Both host names point to a single IP number.