imsproject.org - dns.ninja
imsproject.org
| DNSSEC | π Signed (DS record present) | ||||||
| A | 198.185.159.145πΊπΈ SQUARESPACE-1198.185.159.0/24 Squarespace, Inc. 459 Broadway, 5th Floor New York, NY 10013 US | ||||||
| NS | ns-cloud-c1.googledomains.com β | ||||||
| A | 2001:4860:4802:32::6cπΊπΈ Google2001:4860::/32 | ||||||
| PTR | ns-cloud-c1.googledomains.com | ||||||
| A | 216.239.32.108πΊπΈ Google216.239.32.0/24 | ||||||
| PTR | ns-cloud-c1.googledomains.com | ||||||
| NS | ns-cloud-c2.googledomains.com | ||||||
| A | 2001:4860:4802:34::6cπΊπΈ Google2001:4860::/32 | ||||||
| PTR | ns-cloud-c2.googledomains.com | ||||||
| A | 216.239.34.108πΊπΈ Google216.239.34.0/24 | ||||||
| PTR | ns-cloud-c2.googledomains.com | ||||||
| NS | ns-cloud-c3.googledomains.com | ||||||
| A | 2001:4860:4802:36::6cπΊπΈ Google2001:4860::/32 | ||||||
| PTR | ns-cloud-c3.googledomains.com | ||||||
| A | 216.239.36.108πΊπΈ Google216.239.36.0/24 | ||||||
| PTR | ns-cloud-c3.googledomains.com | ||||||
| NS | ns-cloud-c4.googledomains.com | ||||||
| A | 2001:4860:4802:38::6cπΊπΈ Google2001:4860::/32 | ||||||
| PTR | ns-cloud-c4.googledomains.com | ||||||
| A | 216.239.38.108πΊπΈ Google216.239.38.0/24 | ||||||
| PTR | ns-cloud-c4.googledomains.com | ||||||
| SOA | ns-cloud-c1.googledomains.comcloud-dns-hostmaster@google.com serial=4 | ||||||
org
| DNSSEC | π Signed (DS record present) | ||||||
| NS | a0.org.afilias-nst.info β β οΈ Not in parent delegation | ||||||
| NS | a2.org.afilias-nst.info β οΈ Not in parent delegation | ||||||
| NS | b0.org.afilias-nst.org | ||||||
| NS | b2.org.afilias-nst.org | ||||||
| NS | c0.org.afilias-nst.info β οΈ Not in parent delegation | ||||||
| NS | d0.org.afilias-nst.org | ||||||
| SOA | a0.org.afilias-nst.infohostmaster@donuts.email serial=1784992355 | ||||||
rank #55730 in the tld
WOT: SAFE (60/100)
Subdomains
www.imsproject.org |
Same first word
imsproject.com |
imsproject.org |
Similar names
ismproject.org |
projectsim.com |
miprojects.com.au |
simproject.org |
simproject.com |
projectism.com |
misproject.com |
simproject.net |
projectism.net |
projectism.org |
projectmis.com |
DNS History
12 records (5 active, 7 former)
βNSns-cloud-c1.googledomains.com2026-07-01 β 2026-07-25 Β· 3 obs
β 2026-07-01 08:13:40
β 2026-07-25 16:12:00
βNSns-cloud-c2.googledomains.com2026-07-01 β 2026-07-25 Β· 3 obs
β 2026-07-01 08:13:40
β 2026-07-25 16:12:00
βNSns-cloud-c3.googledomains.com2026-07-01 β 2026-07-25 Β· 3 obs
β 2026-07-01 08:13:40
β 2026-07-25 16:12:00
βNSns-cloud-c4.googledomains.com2026-07-01 β 2026-07-25 Β· 3 obs
β 2026-07-01 08:13:40
β 2026-07-25 16:12:00
βNSns01.domaincontrol.com2019-01-08 β 2019-01-08 Β· 4 obs
β 2019-01-08 15:17:06
β 2026-07-01 08:13:40
β 2026-07-25 16:12:00
βNSns02.domaincontrol.com2019-01-08 β 2019-01-08 Β· 4 obs
β 2019-01-08 15:17:06
β 2026-07-01 08:13:40
β 2026-07-25 16:12:00
βNSns3.inetu.net2015-06-22 β 2016-12-04 Β· 4 obs
β 2016-12-04 20:01:26
β 2019-01-08 15:17:06
β 2026-07-25 16:12:00
βNSns4.inetu.net2015-06-22 β 2016-12-04 Β· 4 obs
β 2016-12-04 20:01:26
β 2019-01-08 15:17:06
β 2026-07-25 16:12:00
βMXmail.imsproject.org2015-06-22 β 2016-12-04 Β· 4 obs
β 2016-12-04 20:01:26
β 2019-01-08 15:17:06
β 2026-07-25 16:12:00
βA198.185.159.1452026-07-01 β 2026-07-25 Β· 3 obs
β 2026-07-01 08:13:40
β 2026-07-25 16:12:00
βA209.235.204.1972015-06-22 β 2015-06-22 Β· 3 obs
β 2015-11-05 10:49:26
β 2026-07-25 16:12:00
βA52.87.69.1022019-01-08 β 2019-01-08 Β· 4 obs
β 2019-01-08 15:17:06
β 2026-07-01 08:13:40
β 2026-07-25 16:12:00
π DNS Trace
π Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| org | b0.org.afilias-nst.org, b2.org.afilias-nst.org, d0.org.afilias-nst.org | - |
| imsproject.org | ns-cloud-c2.googledomains.com, ns-cloud-c1.googledomains.com, ns-cloud-c4.googledomains.com, ns-cloud-c3.googledomains.com | - |
β Authoritative Response
Server:216.239.38.108
NS records: ns-cloud-c2.googledomains.com, ns-cloud-c1.googledomains.com, ns-cloud-c4.googledomains.com, ns-cloud-c3.googledomains.com
π DNSSEC Status
π Secure (DNSSEC validated)
Chain of trust verified from root to domain
β±οΈ Timing
Total: 627ms | Queries: -
π Records
| Type | Count | Sample Data |
|---|---|---|
| A | 1 | 198.185.159.145 |
| NS | 4 | ns-cloud-c2.googledomains.com, ns-cloud-c1.googledomains.com... |
| SOA | 1 | ns-cloud-c1.googledomains.com cloud-dns- |
Analysis
Hierarchy
imsproject.org is a parent domain of www.imsproject.org.
IP Addresses
imsproject.org resolves to one IP address: 198.185.159.145.
towneley.com, ixisteeldesign.com, drvillaltabarberena.com and two other host names share IP numbers with imsproject.org.
Name Servers
The authoritative name servers for imsproject.org are ns-cloud-c1.googledomains.com, ns-cloud-c2.googledomains.com, ns-cloud-c3.googledomains.com and ns-cloud-c4.googledomains.com.
imsproject.org shares at least some of its name servers with other domains, including laurraaawfit.com, smile-center.net, metalhex.com and two others.
The host names ns-cloud-c1.googledomains.com, ns-cloud-c2.googledomains.com, ns-cloud-c3.googledomains.com and ns-cloud-c4.googledomains.com each resolve to two IP addresses: ns-cloud-c1.googledomains.com resolves to 216.239.32.108 and 2001:4860:4802:32::6c; ns-cloud-c2.googledomains.com resolves to 216.239.34.108 and 2001:4860:4802:34::6c; ns-cloud-c3.googledomains.com resolves to 216.239.36.108 and 2001:4860:4802:36::6c; ns-cloud-c4.googledomains.com resolves to 216.239.38.108 and 2001:4860:4802:38::6c.